Request a Quote
Superior

Testing that Reaches the World

EN 61000-4-13 – Harmonics and Interharmonics Immunity Testing

EN 61000-4-13 Harmonics and Interharmonics Immunity Testing Services

EN 61000-4-13 establishes standardized test methods for evaluating the immunity of electrical and electronic equipment to harmonics, interharmonics, and mains signaling disturbances present on AC power supply connections.

Electrical equipment operating on public and industrial power networks may encounter voltage waveform distortion caused by nonlinear loads, power electronic devices, and other electrical systems. These disturbances can affect sensitive electronics, power supplies, control equipment, and measurement systems.

Clark Testing provides electromagnetic compatibility (EMC) testing and equipment qualification services to support manufacturers evaluating equipment immunity, operational reliability, and compliance with applicable industry requirements.

What Is EN 61000-4-13?

EN 61000-4-13 is the European adoption of IEC 61000-4-13, Electromagnetic compatibility (EMC) – Part 4-13: Testing and measurement techniques – Harmonics and interharmonics including mains signalling at a.c. power port, low frequency immunity tests.

The standard establishes laboratory methods for evaluating equipment response to low-frequency disturbances superimposed on the AC supply voltage.

These disturbances include:

  • Harmonics: Frequency components occurring at integer multiples of the fundamental power frequency.
  • Interharmonics: Frequency components that are not integer multiples of the fundamental frequency.
  • Mains signaling: Signals intentionally superimposed on power distribution networks for communication or control purposes.

The standard focuses on equipment immunity rather than the measurement of harmonic emissions generated by the equipment.

Applicable product standards and customer specifications determine the required test conditions and performance acceptance criteria.

Understanding Harmonics and Interharmonics

Harmonic Distortion

Harmonics are voltage or current components occurring at integer multiples of the fundamental power frequency.

For example, on a 60 Hz electrical system, harmonic frequencies include:

  • Second harmonic: 120 Hz
  • Third harmonic: 180 Hz
  • Fifth harmonic: 300 Hz
  • Seventh harmonic: 420 Hz

Harmonic distortion can change the shape of the AC voltage waveform and influence equipment operation.

Interharmonic Disturbances

Interharmonics occur at frequencies between integer multiples of the fundamental power frequency.

These disturbances may originate from power conversion equipment, variable-speed drives, and other electrical systems.

Interharmonic voltages can contribute to fluctuations or unexpected behavior in equipment that relies on stable AC power conditions.

Mains Signaling Disturbances

Mains signaling involves the transmission of control or communication signals over electrical power networks.

EN 61000-4-13 includes immunity considerations for specified signaling frequencies and conditions.

EN 61000-4-13 Test Methods

Testing is performed using equipment capable of generating controlled AC supply waveforms with specified harmonic or interharmonic components.

Depending on the applicable test program, evaluations may include:

Individual Harmonic Testing

Specified harmonic components are introduced into the AC supply waveform to evaluate equipment response.

Interharmonic Testing

Non-integer frequency components are introduced under controlled conditions to evaluate susceptibility to interharmonic disturbances.

Frequency Sweep Testing

Selected disturbance frequencies may be varied across a specified range while monitoring equipment performance.

Mains Signaling Immunity

Where applicable, specified signaling components are introduced to assess equipment behavior in the presence of low-frequency signals on the power supply.

The exact test levels, frequencies, sequences, and operating conditions depend on the referenced edition and applicable product requirements.

EN 61000-4-13 Testing Procedure

A typical immunity evaluation includes:

  • Test planning: Reviewing equipment ratings, applicable standards, operating modes, and performance criteria.
  • Equipment setup: Connecting the equipment under test to a suitable programmable AC source or immunity test generator.
  • Baseline verification: Confirming normal equipment operation under the required nominal supply conditions.
  • Harmonic disturbance application: Introducing specified harmonic components into the supply voltage.
  • Interharmonic disturbance application: Applying the required interharmonic frequencies and levels.
  • Mains signaling evaluation: Applying specified signaling disturbances where required.
  • Functional monitoring: Observing equipment operation during each test condition.
  • Results documentation: Recording applied disturbances, operating conditions, equipment responses, and performance results.

Testing helps manufacturers evaluate how equipment performs when exposed to controlled low-frequency supply disturbances.

Applications for EN 61000-4-13 Testing

Harmonic and interharmonic immunity testing may support manufacturers of:

  • Industrial automation and control systems
  • AC-powered electronic equipment
  • Power conversion and monitoring equipment
  • Programmable logic controllers
  • Electrical measurement and instrumentation systems
  • Industrial communication equipment
  • Power generation control systems
  • Electronic equipment used in commercial and industrial facilities

Testing may support product development, design verification, troubleshooting, and customer-specific qualification programs.

Why Harmonic and Interharmonic Immunity Testing Matters

Electrical power networks do not always deliver perfectly sinusoidal voltage waveforms.

Nonlinear loads, switching devices, and power electronic systems can introduce harmonic and interharmonic disturbances that alter supply voltage characteristics.

Depending on the equipment design, these disturbances may contribute to:

  • Measurement inaccuracies
  • Control system malfunctions
  • Unexpected equipment resets
  • Power supply instability
  • Communication interruptions
  • Changes in equipment operating performance
  • Unintended equipment responses

Laboratory immunity testing helps manufacturers evaluate potential vulnerabilities and identify opportunities to improve power supply design, filtering, and control system reliability.

EN 61000-4-13 and Related EMC Standards

EN 61000-4-13 addresses immunity to low-frequency harmonics, interharmonics, and mains signaling disturbances.

Related standards include:

  • EN 61000-4-11: Voltage dips, short interruptions, and voltage variations immunity testing.
  • EN 61000-4-12: Ring wave immunity testing.
  • EN 61000-4-6: Conducted radio-frequency immunity testing.
  • EN 61000-4-4: Electrical fast transient/burst immunity testing.
  • IEC 61000-3-2: Limits for harmonic current emissions from applicable equipment.

EN 61000-4-13 evaluates equipment immunity, while IEC 61000-3-2 addresses harmonic current emissions. These are different aspects of electromagnetic compatibility.

Manufacturers should select the appropriate standards based on equipment characteristics and applicable product requirements.

EN 61000-4-13 Testing at Clark Testing

Clark Testing supports manufacturers with electromagnetic compatibility testing, electrical immunity evaluations, and equipment qualification services.

Our EMC testing team can review equipment power requirements, operating conditions, applicable test frequencies, disturbance levels, and performance criteria to help determine an appropriate harmonic and interharmonic immunity testing program.

Whether evaluating a new electronic product or investigating susceptibility to AC power waveform distortion, Clark Testing can assist with test planning, laboratory evaluation, and technical documentation.

Contact Clark Testing to discuss EN 61000-4-13 harmonics and interharmonics immunity testing requirements or request a quotation for EMC testing services.