Testing that Reaches the World
On-Site Measurement & Engineering Support
Field Services Testing Services
Real-world operating conditions do not always fit inside a laboratory. Clark Testing provides on-site field testing, instrumentation, data acquisition, and engineering analysis to help customers understand how equipment and structures perform in service.
Our engineers and technicians support field testing management, attended and unattended measurements, data analysis, and technical reporting. We can develop a measurement approach around your equipment, environment, available access, and project objectives.
FIELD TESTING CAPABILITIES
Instrumentation, Monitoring & Analysis
Field programs are tailored to the behavior being measured, from short-duration attended testing to longer-term unattended data collection.
On-Site Measurement
- Attended and unattended data acquisition
- Stress and strain measurement
- Vibration measurement and analysis
- Thermal recording and temperature monitoring
- Noise monitoring
Specialized Field Support
- Electromagnetic compatibility (EMC) field measurement support
- Coal and coke testing field services
- Field test planning, instrumentation setup, and test execution
- Data processing, engineering interpretation, and report generation
Data acquisition: Clark Testing's existing field-service capabilities include high-channel-count collection, simultaneous high- and low-sample-rate measurements, and configurable event triggers. Instrumentation and achievable measurement ranges are confirmed for each project.
Field Measurement Solutions
On-Site Testing Capabilities
Data Acquisition: Attended & Unattended
Field data acquisition can capture equipment response during controlled test events or normal operation. Depending on the project, measurements may use multiple channels, different sample rates, and event-based triggers to focus on relevant operating conditions.
Stress & Strain Analysis
Strain measurement can help characterize loading, structural response, and operating stresses on components and assemblies. Instrumentation placement, calibration, environmental conditions, and load history are important to useful results.
Vibration Analysis
On-site vibration measurement supports investigations of dynamic behavior, machinery response, resonances, and operational vibration exposure. The measurement plan may consider operating speed, mounting location, frequency range, and representative duty cycles.
Thermal Recording
Temperature data can document operating trends, transient events, and localized heating during equipment use. Sensor selection and placement depend on the component, temperature range, and accessibility.
Noise Monitoring
Noise measurement can help characterize sound levels and changes during operation. Applicable metrics, measurement locations, background conditions, and any required compliance standard should be defined before testing.
Electromagnetic Compatibility
Field EMC work may help investigate electromagnetic conditions or equipment behavior in its installed environment. Scope, instrumentation, test setup, and any standard-specific compliance claims require project-level review. Learn more about our EMC testing services.
Coal & Coke Field Testing
Field support for coal and coke operations can be coordinated with laboratory analysis and customer sampling requirements. Site access, sampling methods, sample handling, and the requested testing program should be established in advance.
Measurement Planning
How a Field Testing Project Works
1. Define the Objective
Identify the equipment or structure, the engineering question, operating modes, site conditions, and whether the objective is troubleshooting, characterization, or comparison with a specified requirement.
2. Develop the Instrumentation Plan
Determine measurement locations, sensor types, channel count, sampling needs, triggering, duration, power, environmental protection, and any site safety or access restrictions.
3. Acquire Field Data
Clark Testing personnel can support instrumentation and attended data collection or plan for unattended acquisition where appropriate. Actual test configuration and site responsibilities are agreed upon before mobilization.
4. Analyze & Report
Collected data is reviewed in the context of operating conditions, test objectives, and relevant acceptance criteria. Reporting scope may include plots, measured values, observations, and engineering interpretation.
Technical Reference
Field Measurement Methods & Standards Considerations
There is no single standard governing every field testing project. Standards are selected based on the equipment, industry, required measurements, and customer specification. The examples below are discussion points, not blanket claims of accredited testing to every listed method.
| Field measurement | Typical application | Technical considerations |
|---|---|---|
| Multi-channel data acquisition | Capture synchronized operational response | Sample rate, channel synchronization, triggering, data integrity |
| Strain measurement | Load and structural response evaluation | Gauge location, installation, temperature compensation, calibration |
| Vibration measurement | Machinery or structural dynamics | Sensor mounting, bandwidth, operating conditions; ISO 20816 series may be relevant for selected machinery |
| Temperature monitoring | Thermal behavior during operation | Sensor type, contact, response time, operating range |
| Noise monitoring | Operational acoustic characterization | Measurement location, weighting, background noise, applicable customer criteria |
| EMC field evaluation | Installed-equipment electromagnetic investigation | Site conditions, frequency range, measurement method and project-specific standard |
| Coal & coke field support | Sampling and operational testing support | Sampling plan, chain of custody, material handling, laboratory method |
For vibration-related methods and terminology, consult the International Organization for Standardization (ISO). Clark Testing can help determine whether a specific published standard or customer-developed test procedure is appropriate.
Project Preparation
Information That Helps Us Scope Field Testing
Provide a site location, equipment description, photographs or drawings, measurement objectives, anticipated operating conditions, expected duration, available power, access restrictions, and any governing standard or customer test procedure. For time-sensitive events, include the proposed test window and whether measurements must be attended or unattended.
Related laboratory capabilities include vibration testing, condition monitoring, and coal and coke testing. Confirm individual service URLs and scope before publishing.
Common Questions
Field Testing FAQs
Can Clark Testing collect data while equipment is operating?
Yes. Field testing is intended to evaluate equipment under real-world conditions. Feasibility depends on safe access, instrumentation, operating schedules, and the desired measurements.
Do you support unattended monitoring?
Yes. The existing field-services offering includes attended and unattended data acquisition. Duration, triggering, data storage, and site responsibilities are determined for each project.
Can you measure strain, vibration, temperature, and noise?
These are listed among Clark Testing's field-service capabilities. The precise sensors, channel counts, measurement ranges, and reporting deliverables should be confirmed during scoping.
Can field testing be used for compliance?
It can support a compliance evaluation when a defined standard, suitable instrumentation, test conditions, and acceptance criteria are established. Not every field measurement constitutes a certified or accredited compliance test.
What is the difference between field testing and laboratory testing?
Field testing measures equipment in its installed or operating environment, while laboratory testing provides more controlled test conditions. Both approaches can be useful, depending on the engineering question.
What should be included in a field testing quote request?
Share the equipment, site, measurement goals, operating conditions, proposed schedule, required standards, and expected deliverables. Photos, drawings, and prior data are especially helpful.
Work with Clark Testing
Measure Performance Where It Matters
Tell us what needs to be measured and where the equipment operates. Our team can discuss a practical on-site testing and data acquisition plan.





